Resources

Guides to importing, installing and running a vending machine in Europe and Australia.

Guides

What is worth knowing before you buy or lease a machine.

From order to your venue

Indicative lead times. The quote states the ones for your order.

  1. Manufacturing

    2–4 weeks

  2. Pre-shipment inspection

    2–3 days

  3. Packing and loading

    2 days

  4. Sea freight

    4–6 weeks

  5. Customs

    3–5 days

  6. Delivery and installation

    1–3 days

Documents we ask for

What must come with each machine to sell it legally in the European Union.

From the manufacturer

  • EU declaration of conformity

    Signed by the manufacturer according to Directive 2006/42/EC

  • Technical manual

    In the language of the destination country, with wiring diagrams and parts list

  • EMC test report

    Electromagnetic compatibility test (Dir. 2014/30/EU)

  • Low-voltage test report

    Low voltage test (Dir. 2014/35/EU)

  • Technical file

    Risk analysis and safety assessment

For EU customs

  • Commercial invoice

    With Incoterm, weight, value and detailed description

  • Packing list

    Breakdown of packages, gross/net weights and dimensions

  • Bill of Lading (B/L)

    Original ocean freight bill of lading

  • TARIC code

    Tariff classification checked before shipping

  • Import declaration

    Filed by a customs broker

In Australia the reference is the RCM mark (electrical safety and electromagnetic compatibility) and clearance with Australian customs. We detail it in your quote.

Need help with the paperwork?

We handle the import, customs and documents for each machine.